Scope Management Cheat Sheet
PMP scope management quick reference — WBS, requirements, scope creep vs gold plating, and validation.
Scope Management — Quick Reference
Product Scope vs. Project Scope
- Product scope — Features and functions of the product (measured against requirements)
- Project scope — Work required to deliver the product (measured against the project management plan)
Work Breakdown Structure (WBS)
- Hierarchical decomposition of the total scope
- Lowest level = work package
- 100% Rule: WBS must include 100% of the work defined by the scope
- WBS Dictionary: describes each element (description, milestones, costs, resources)
- The WBS is scope — if it's not in the WBS, it's not in the project
Scope Creep vs. Gold Plating
| Scope Creep | Gold Plating | |
|---|---|---|
| What | Uncontrolled scope additions | Extra features beyond scope |
| Who | Stakeholders/customers | Project team |
| Approved? | Not through change control | Not requested |
| Both are bad | Neither should happen — use change control | |
Validate Scope vs. Control Quality
| Validate Scope | Control Quality | |
|---|---|---|
| Focus | Customer acceptance | Correctness of deliverables |
| Who | Customer/sponsor | QA/QC team |
| Output | Accepted deliverables | Verified deliverables |
| When | After Control Quality | Before Validate Scope |
Requirements Collection Techniques
- Interviews — One-on-one, detailed requirements gathering
- Focus Groups — Group discussion with pre-qualified stakeholders
- Workshops — Cross-functional group sessions for alignment
- Questionnaires/Surveys — Large audience, statistical analysis
- Brainstorming — Generate ideas without judgment
- Prototyping — Build models to clarify requirements
- Observation — "Job shadowing" to understand actual work